Data center construction market in the Nordic

Press release   •   Sep 08, 2016 08:41 EDT

p { margin-bottom: 0.25cm; line-height: 120%; }a:link { }

The demand for cloud-based services and the growth of the Internet of Things (IoT) are prompting enterprises in the Nordic region to construct data centers to gain a competitive edge. Complexities associated with business applications have increased due to an exponential growth in data volumes, triggering an increased need for construction and renovation of data centers. In addition, enterprises are focusing on the construction of green data center facilities to reduce power consumption and carbon dioxide emissions.

Technavios analysts forecast the data center construction market in the Nordic region to grow at a CAGR of 22.36% during the period 2016-2020.

Covered in this report

The report covers the present scenario and the growth prospects of the data center construction market in the Nordic region for 2015-2020. To calculate the market size, the report considers the revenue generated from new data center construction (including modular data centers) and renovation of data centers.

The market is divided into the following segments based on electrical construction:

UPS systems

Energy storage equipment

Generators

Transfer switches and switchgear

Others

Technavio's report, Data Center Construction Market in Nordic Region 2016-2020, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.

Download Sample Copy of This Report at: http://www.marketresearchreports.biz/sample/sample/700632

p { margin-bottom: 0.25cm; line-height: 120%; }a:link { }

The demand for cloud-based services and the growth of the Internet of Things (IoT) are prompting enterprises in the Nordic region to construct data centers to gain a competitive edge. Complexities associated with business applications have increased due to an exponential growth in data volumes, triggering an increased need for construction and renovation of data centers. In addition, enterprises are focusing on the construction of green data center facilities to reduce power consumption and carbon dioxide emissions.

Technavios analysts forecast the data center construction market in the Nordic region to grow at a CAGR of 22.36% during the period 2016-2020.

Covered in this report

The report covers the present scenario and the growth prospects of the data center construction market in the Nordic region for 2015-2020. To calculate the market size, the report considers the revenue generated from new data center construction (including modular data centers) and renovation of data centers.

The market is divided into the following segments based on electrical construction:

UPS systems

Energy storage equipment

Generators

Transfer switches and switchgear

Others

Technavio's report, Data Center Construction Market in Nordic Region 2016-2020, has been prepared based on an in-depth market analysis with inputs from industry experts. The report covers the market landscape and its growth prospects over the coming years. The report also includes a discussion of the key vendors operating in this market.

Download Sample Copy of This Report at: http://www.marketresearchreports.biz/sample/sample/700632