Gå videre til innhold

Kategorier: renewable energy

  • The Riga Hydro Power Plant (HPP) is to be assessed by Multiconsult for increased safety.

    ​Assessing dam safety in Latvia

    Multiconsult has been selected to assess the safety of the hydrotechnical structures of the Daugava River hydropower projects in Latvia.
    Reducing the likelihood of a dam emergency
    Hilde Gillebo, EVP for Energy in Multiconsult said “Dam failure can pose a serious risk to the public. If a dam that impounds a reservoir or lake were to fail, it could potentially affect communities

  • The Itezhi Tezhi Dam in Zambia. | Photo: Multiconsult

    ​Assessment of Itezhi Tezhi Dam in Zambia


    ZESCO Limited of Zambia has awarded Multiconsult a contract to undertake an assessment of old electrical and control systems for electro-mechanical equipment at Itezhi Tezhi Dam. Through the project, Multiconsult will review all of the electrical equipment that power and control the Dam’s electro-mechanical equipment, provide recommendations and carry out detailed designs and specification for