Great Northern's Northern City Line celebrates one year of no signals
Great Northern's Northern City Line today celebrates one year since its physical lineside signals were removed
Great Northern's Northern City Line today celebrates one year since its physical lineside signals were removed
Rail operator has confirmed it will again be providing an enhanced service for the annual celebrations
More trains and extra capacity will help people travel to and from the event safely
GTR – which runs Southern, Thameslink and Gatwick Express services in and out of Brighton – has confirmed once again that it will have an enhanced train service in place for the return of Pride, which takes
Southern and Thameslink have joined forces with Imperial College London to highlight air quality issues in south London
Passengers using one of south London's busiest stations - Peckham Rye - are set to benefit from a package of improvements being delivered by Network Rail and Southern Railway, designed to reduce congestion, improve passenger flow and cater for future growth
Successful testing at speed has been completed of upgraded digital software on a Thameslink Class 700 unit, preparing the largest passenger fleet on the East Coast Main Line (ECML) for the introduction of in-cab digital signalling
Passengers using the Thameslink platforms at London St Pancras are being advised that step-free access will be temporarily unavailable while major refurbishment work takes place to improve the long-term reliability of the station’s lifts
Model trains built by 100 schoolchildren from across Stevenage have been put to the test by an expert panel of Thameslink and Great Northern judges as part of a programme to encourage the nation’s future engineers.
Railway improvement work will mean no Thameslink trains running between Bedford and Mill Hill Broadway in north London this weekend (Saturday 9 and Sunday 10 May), while East Midlands Railway (EMR) services will not run south of Bedford
A familiar sound for passengers travelling on trains across London and the South Coast is being given the silent treatment by train operator Southern.
An event has been held to mark the official opening of Harlington station’s new footbridge.
Network Rail has issued the following press release after research found overconfidence is putting lives at risk when using railway level crossings in and around Brighton.
Train timetables are changing at Southern, Thameslink, Great Northern and Gatwick Express
Govia Thameslink Railway is marking Earth Day today by establishing a Sustainability Academy for employees. The candidates will champion the principles of an important new Sustainability Strategy, helping embed it across the train operating company that runs Southern, Thameslink, Great Northern and Gatwick Express
Govia Thameslink Railway (GTR) delivered a £3.2 billion contribution to the UK economy in 2025, supporting 40,000 jobs, according to a new report by Oxford Economics.
Govia Thameslink Railway is part of the Go-Ahead Group, one of the UK’s largest public transport operators, and the Group contributed £6.4 billion to the UK economy in 2025 and supported 86,900 jobs across the UK, operating bus a
A modern footbridge designed to last 120 years opened today at Harlington station. The old footbridge will be removed during a busy programme of improvement work which will close the tracks between Bedford and Harpenden on Saturday 18 and Sunday 19 April
Passengers travelling through Ely this spring will soon benefit from smoother journeys as essential weekend engineering work to improve reliability takes place on one of the busiest parts of the region’s rail network.
Network Rail and train operators are urging passengers to save the date for February half term next year when major engineering work will close a section on the busy Brighton Main Line from Saturday 13 to Sunday 21 February 2027.
A £4.5 million upgrade of canopies and staircase roofs is currently underway at Stevenage station, along with the full renewal of all platform lighting.
New Southern West Coastway train timetable has more frequent trains (with up to 5,000 extra seats a day), that are more punctual and reliable, and with many faster journeys.
Industry partners in the transformational East Coast Digital Programme (ECDP) have signed a £32.7million contract to upgrade the Class 700 Thameslink fleet to the latest specification of European Train Control System