Press release

ABB Virginia offshore wind study details transmission options

One substation platform with two 230kV power lines is sufficient to transmit to shore every 500MW to 700MW of electricity generated by a wind farm off the coast of Virginia, ABB Power Systems Consulting estimates in a study done for utility Dominion Virginia Power (DVP).

http://www.rechargenews.com/energy/wind/article307281.ece

Topics

  • Finance

Categories

  • renewable energy
  • recharge

Business news since 1889.

Contacts