Skip to content
The Pajkölen 40 MW Project Site.jpg

Image -

The Pajkölen 40 MW Project Site.jpg

go to media item
License:
Media Use
The content may be downloaded by journalists, bloggers, columnists, creators of public opinion, etc. It can be used and shared in different media channels to convey, narrate, and comment on your press releases, posts, or information, provided that the content is unmodified. The author or creator shall be attributed to the extent and in the manner required by good practice (this means, for example, that photographers should be attributed).
File format:
.jpg
Size:
4000 x 3000, 2.05 MB
Download

Contacts

Related content

  • The “Pajkölen” project will achieve a 40 MW / 80 MWh throughput by 2025, bringing the Swedish company’s battery storage capacity to 270 MW (Photo is from Flower's 42,5 MW BESS in Bredhälla)

    Flower Acquires Energy Storage Project from Arise to Expand Sweden's Biggest Battery Portfolio

    Advancing towards enabling the renewable energy transition in Sweden, the energy tech company Flower is now acquiring one of Sweden’s largest battery projects. The project, which is a Ready-to-Build 40 MW / 80 MWh BESS site being developed by the renewable energy actor Arise, will play a crucial role in supporting the Swedish energy system. “This will be a breakthrough asset for our portfolio that