Video -
wave tank testing
Video Coast Laboratory Plymouth, wave tank testing/verification of numerical simulations. Lifting 600 kg in every wave cycle, equaling 800 tons in NO500, our 500 Kw first commercial unit. The horizontal loads on the moorings only 30 kg, ratio 1/20 of the lift force, a first in wave power:
go to media item
- License:
- All rights reserved
The Content may only be used by Mynewsdesk. It is thus not permissible for anyone else to download, copy, distribute or otherwise use the Content (other than for private use to the extent permitted by law).
- File format:
- .mp4
- Length:
- 1:44
Topics
- Science, technology
Categories
- förnybar energi
- vågkraftverk
- vågenergi