News —

Temporary rerouting of arrivals level traffic

All traffic including traffic to the short-term parking will be rerouted to the departure level for up to two weeks. The detour will be clearly signposted.

The reason for the closure is that the pedestrian crossings on the arrival level will be reduced from two to one crossing.  This will create a safer and more orderly traffic situation by concentrating the passenger flow between the terminal and parking facility to one area.

Topics

  • Art, Culture, Entertainment
  • Media, Communication
  • Transport
  • Vacation
  • Travels
  • Public sector
  • Air service
  • Freight, Transport
  • Adventures

Categories

  • airport operations

Contacts

Related content

  • The South Pier – temporary pier

    The South Pier at Oslo Airport opens on 3 Sept. The pier is temporary and is being built to maintain capacity during the airport expansion.

  • New arrivals and departures hall to the west

    We are not constructing a new terminal, but expanding the existing one. The terminal will still be one building, as the new section will be integrated in the existing terminal. It will have the same characteristic roof and volume as it currently has. Work will commence in the summer of 2012 and the new hall will be completed in 2017.

  • Construction of the North Pier

    The construction of a completely new pier will commence in spring 2013. We already have the International Pier stretching to the east and the Domestic Pier to the west. The new, and third, pier, will stretch to the north, and handle both international and domestic traffic, separated on two levels.

  • Rebuilding the railway station

    The rebuilding of the Oslo Airport Railway Station will commence in April. The station will be larger and more open, have a new ceiling, as well as a new Arrivals and departures hall to the west.