Document -

Stena Line launches 'battery power' initiative

​The next step in Stena Line's ongoing sustainability strategy is to test new environmentally friendly energy options for the propulsion of its vessels. Stena Line recently signed a contract with Callenberg Technology Group for batteries with a total capacity of 1 MWh which will be installed on the Stena Jutlandica, which operates between Gothenburg and Frederikshavn.
  • License: Media Use
    The content may be downloaded by journalists, bloggers, columnists, creators of public opinion, etc. It can be used and shared in different media channels to convey, narrate, and comment on your press releases, posts, or information, provided that the content is unmodified. The author or creator shall be attributed to the extent and in the manner required by good practice (this means, for example, that photographers should be attributed).
  • File format: .docx
Download

Related content