Skip to content
Erdington bridge strike 7 January 2025_cropped.jpg

Image -

Erdington bridge strike 7 January 2025_cropped.jpg

go to media item
License:
Media Use
The content may be downloaded by journalists, bloggers, columnists, creators of public opinion, etc. It can be used and shared in different media channels to convey, narrate, and comment on your press releases, posts, or information, provided that the content is unmodified. The author or creator shall be attributed to the extent and in the manner required by good practice (this means, for example, that photographers should be attributed).
File format:
.jpg
Size:
1536 x 864, 1.23 MB
Download

Topics

Regions

Contacts

Related content

  • Credit: Network Rail

    Drivers urged to ‘wise up, size up’ after bridge bashed twice in one day

    Lorry drivers are being urged to know the height of their vehicle after a Birmingham bridge was hit three times in less than a week.
    The railway bridge on Summer Lane, Erdington, was hit just before 10am today (7 January). After being inspected and given the green light to safely reopen, it was then bashed for a second time at 12.10pm, reopening again at 1.45pm.
    The first lorry did not stop