Skip to content
Temporary OLE structure_cropped.jpg

Image -

Temporary OLE structure_cropped.jpg

go to media item
License:
Media Use
The content may be downloaded by journalists, bloggers, columnists, creators of public opinion, etc. It can be used and shared in different media channels to convey, narrate, and comment on your press releases, posts, or information, provided that the content is unmodified. The author or creator shall be attributed to the extent and in the manner required by good practice (this means, for example, that photographers should be attributed).
File format:
.jpg
Size:
3200 x 1800, 2.63 MB
Download

Topics

Regions

Contacts

Related content

  • Full service resumes between Tamworth and Nuneaton following repairs to overhead line equipment

    Full service resumes between Tamworth and Nuneaton following repairs to overhead line equipment

    A normal timetable has been restored on the West Coast Main Line between Tamworth and Nuneaton after successfully installing a prop to an overhead line structure.
    Engineers have completed work to temporarily restore the railway near Polesworth after damage to an overhead line structure was discovered during a routine track inspection on 6 December.
    During the repairs, engineers installed a t