Image -
GTR is aiming to deliver the highest recycling rate of any station on the rail network
Since the installation of the MSU at Brighton station, the facility has prevented over 160 tonnes of waste going to incineration.
PA
- License:
- Media Use
The content may be downloaded by journalists, bloggers, columnists, creators of public opinion, etc. It can be used and shared in different media channels to convey, narrate, and comment on your press releases, posts, or information, provided that the content is unmodified. The author or creator shall be attributed to the extent and in the manner required by good practice (this means, for example, that photographers should be attributed).
- By:
- PA
- File format:
- .jpg
- Size:
- 4000 x 2667, 973 KB