Skip to content
Mark Pountain last Class 365

Image -

Mark Pountain last Class 365

Hornsey Engineering Technician Mark Pountain helped make and maintain the Class 365s. He joined the last trip out of King's Cross on 14 May 2021
go to media item
License:
Media Use
The content may be downloaded by journalists, bloggers, columnists, creators of public opinion, etc. It can be used and shared in different media channels to convey, narrate, and comment on your press releases, posts, or information, provided that the content is unmodified. The author or creator shall be attributed to the extent and in the manner required by good practice (this means, for example, that photographers should be attributed).
File format:
.jpg
Size:
1060 x 864, 691 KB
Download

Topics

Categories

Related content

  • Mark Pountain at the final run of the Class 365 out of King's Cross. Mark has been with the trains their entire life

    Mark proud to have made and maintained the Class 365s

    Hornsey Engineering Technician Mark Pountain, has accompanied the Class 365 fleet along its entire journey from the day he helped build the trains to its last run out of King’s Cross on Friday (14 May).
    An apprentice-trained vehicle body builder working at the former British Rail Engineering York Carriage Works in Holgate Road, Mark came to Hornsey in 1996 as product support, working with a wa

  • Driver Paul French (left) and Route Operations Assurance Manager Steve Castle proudly hold the headboard ahead of the last Class 365 out of King's Cross

    1812 is final overture for Class 365 ‘Networker Express’

    Click here to read how Mark was proud to have made and maintained the Class 365s
    Train enthusiasts joined commuters on Friday (14 May) to ride the last Great Northern Class 365 train out of King’s Cross, after 25 years of service.
    The 18:12 farewell service, lengthened from eight to 12 carriages for the special journey, called at Stevenage, Biggleswade, St Neots and Huntingdon on its way to