30% reduced CO2 emissions in quay work for the Skandia Gateway project
Climate-smart quay construction in Skandia Gateway: 30% lower CO₂ emissions at only 1% higher cost, thanks to material requirements and innovation.
Climate-smart quay construction in Skandia Gateway: 30% lower CO₂ emissions at only 1% higher cost, thanks to material requirements and innovation.
Gothenburg and Sweden could be the first in the world to create a joint infrastructure for the transport of liquefied carbon dioxide extracted using CCS technology. The project – CinfraCap – is a unique collaborative venture between Göteborg Energi, Nordion Energi, Preem, St1, Renova, and Gothenburg Port Authority.
The Port of Gothenburg has embarked on a major project that will involve replanting 1.7 hectares of vital eelgrass meadows that will disappear with the building of a new terminal as part of the Port’s expansion programme.
A unique website is launched. The maritime world is discovering the Onshore Power Supply (OPS) technology and now the best of knowledge is gathered on one specific website.