Image -
First-in-class 387 prepped ready to leave for ETCS retrofit
First-in-class 387 prepped ready to leave for ETCS retrofit. Pictured from left are: Govia Thameslink Railway ERTMS Fleet Project Manager Aaron Meakin, Alstom Lead Project Manager Ian Coleman and Porterbrook Fleet Engineer Mick Ridgeway
go to media item
- License:
- Media Use
The content may be downloaded by journalists, bloggers, columnists, creators of public opinion, etc. It can be used and shared in different media channels to convey, narrate, and comment on your press releases, posts, or information, provided that the content is unmodified. The author or creator shall be attributed to the extent and in the manner required by good practice (this means, for example, that photographers should be attributed).
- File format:
- .jpg
- Size:
- 1515 x 1773, 1.9 MB