Expanding fast charging without a grid upgrade: Stadtwerke Würzburg adds ADS-TEC Energy ChargePost to existing charging site
German municipal utility Stadtwerke Würzburg has expanded an existing fast-charging site in Kist with a battery-buffered ChargePost from ADS-TEC Energy. Despite limited grid capacity, total installed charging power has increased from 300 to 530 kW, doubling the number of fast-charging points from two to four, without requiring a transformer upgrade.