Bad Lauchstädt Energy Park Produces Green Hydrogen For the First Time
Green hydrogen has been produced for the first time in the 30-megawatt electrolysis plant at the Bad Lauchstädt Energy Park. The electrolysis plant, jointly operated by Uniper and VNG, is the heart of the hydrogen production process: it uses renewable electricity from the connected wind farm to split water into hydrogen and oxygen.
The next step involves optimizing the interaction of electricit