New work clothes on the way
ESVAGT is replacing its complete range of work clothes. Safety and visibility come before fashion.
ESVAGT is replacing its complete range of work clothes. Safety and visibility come before fashion.
ESVAGT works hard to stay in shape. The ‘Esvagt Capri’ leads the fitness competition.
The secretariat for the Tall Ships Races was based in the offices that ESVAGT recently acquired from IAT.
At the beginning of August, ESVAGT took the opportunity to invite visitors in for a sneak preview behind the facade of their new, almost completed, premises during the Tall Ships Race in Esbjerg.
Classical disciplines such as ”banging-in-nails” and ”stick-in-bottle” settled in an intense atmosphere
The number of working hours is increasing and the frequency of incidents decreasing
ESVAGT and Vestas have a very good cooperation in servicing the wind farm Blight Bank in Belgium. The cooperation was further strengthened on a teambuilding day, where the crew from “Esvagt Supporter” was invited to participate.
ESVAGT’s new office building on the Dock Harbour at Esbjerg will be ready for occupancy in the summer of 2014
”Esvagt Gamma” reacted to an emergency call from a German supply vessel with engine failure. The vessel was towed to a safe anchorage.
The ESVAGT winter specialist is part of a series of theme programmes on extreme constructions on the Discovery Channel.
Boating is the core competence in ESVAGT – now it is to be strengthened even further
The ESVAGT boat based crew change is a structured operation where dedicated crews and thoroughly trained personnel work together optimally. That is the explanation why the crew change vessels have achieved 5 and 13 years respectively without a single Lost Time Incident (LTI).