Battery storage enables fast charging at VfB Stuttgart using the existing grid connection
ADS-TEC Energy ChargePost provides two public charging points with up to 250 kW of charging power
Integrated battery storage enables fast-charging without a medium-voltage grid connection
Another joint project with Stadtwerke Stuttgart, following the fast-charging hub in Zuffenhausen
Nürtingen/Stuttgart, Germany, October 22, 2026. Electric vehicles can now charge at up to 250 kW at the club c