Stadtwerke Murau strengthen regional energy resilience with island-capable battery storage from ADS-TEC Energy
Two battery energy storage systems providing a total capacity of 10 MWh and 4.8 MW of power
Combination of hydropower and BESS enables stable island operation during grid outages
Integrated energy system enhances grid stability, flexibility and security of supply
Murau (AT) /Nürtingen (GER), June 18, 2026 – With the delivery of a new battery energy storage system (BESS), Murauer Stadtwerke (M